{"id":342305,"date":"2026-05-29T05:09:55","date_gmt":"2026-05-28T23:39:55","guid":{"rendered":"https:\/\/ebiztoday.news\/?p=342305"},"modified":"2026-05-29T05:09:55","modified_gmt":"2026-05-28T23:39:55","slug":"first-gen-says-hydropower-projects-may-yield-p16b-annually-by-2031","status":"publish","type":"post","link":"https:\/\/ebiztoday.news\/index.php\/2026\/05\/29\/first-gen-says-hydropower-projects-may-yield-p16b-annually-by-2031\/","title":{"rendered":"First Gen says hydropower projects may yield P16B annually by 2031"},"content":{"rendered":"<p><\/p>\n<div>\n<div class=\"td-post-featured-image\">\n<figure><figcaption class=\"wp-caption-text\">The Upper Wawa Dam in Rizal \u2014 PRIMEINFRA.COM<\/figcaption><\/figure>\n<\/div>\n<p class=\"p2\">LOPEZ-LED First Gen Corp. expects its investments in hydropower projects owned by Razon-led Prime Infrastructure Capital, Inc. to contribute P16 billion annually starting in 2031, potentially becoming the biggest earnings contributor across its portfolio.<\/p>\n<p class=\"p3\">First Gen President and Chief Operating Officer Francis Giles B. Puno said the corporate is making a long-term investment in pumped-storage hydropower assets, which he said are expected to turn out to be \u201cprobably the most critical segments of the long run energy system.\u201d<\/p>\n<p class=\"p3\"><span class=\"s2\">\u201cAs renewables proceed to scale, considered one of the central challenges facing power systems is not any longer simply generation, but operational flexibility \u2014 the power to store energy when supply is abundant, and deliver it when the system needs it most,\u201d he said at the corporate\u2019s annual stockholders\u2019 meeting on Thursday.<\/span><\/p>\n<p class=\"p3\"><span class=\"s3\">First Gen invested P62 billion for a 33% stake in Prime Infra\u2019s 2,000-megawatt (MW) pumped-storage hydropower portfolio.<\/span><\/p>\n<p class=\"p3\">Mr. Puno said the facilities are projected to make a big contribution to the corporate\u2019s earnings through a 20-year contracted agreement under the federal government\u2019s green energy auction program.<\/p>\n<p class=\"p3\">The projects are expected to generate 3 times the historical average contribution from the 60% stake in natural gas assets sold to Prime Infra, based on performance from 2018 to 2024, he said.<\/p>\n<p class=\"p3\"><span class=\"s3\">\u201cWhile these projects require significant upfront capital and a number of other years for construction before meaningful money flow generation, the long-term economics remain compelling,\u201d Mr. Puno said.<\/span><\/p>\n<p class=\"p3\"><span class=\"s4\">As of end-2025, First Gen had an installed renewable energy capability of 1,764.2 MW from hydro, geothermal, solar, and wind facilities nationwide.<\/span><\/p>\n<p class=\"p3\"><span class=\"s4\">The corporate operates the Pantabangan-Masiway complex and the Casecnan hydroelectric facility in Nueva Ecija. The facilities generated 1,074.8 gigawatt-hours last yr, greater than double the output recorded in 2024.<\/span><\/p>\n<p class=\"p3\">First Gen can also be preparing for the event of the 120-MW Aya Pumped Storage Project adjoining to the Pantabangan facility.<\/p>\n<p class=\"p3\"><span class=\"s3\">Individually, First Gen Chief Executive Officer Federico \u201cPiki\u201d R. Lopez said he hopes for \u201can amicable, fair, and lasting resolution of the rift\u201d involving the Lopez family.<\/span><\/p>\n<p class=\"p3\">\u201cI remain fully prepared for any consequence that may follow this peace overture and I&#8217;ll proceed to meet my fiduciary duties to all shareholders in the businesses of the Lopez Group,\u201d Mr. Lopez said.<\/p>\n<p class=\"p3\">His statement got here after the bulk bloc of Lopez family holding company Lopez, Inc. withdrew a Feb. 27 board resolution removing Mr. Lopez as president and chief executive officer.<\/p>\n<p class=\"p3\">The Lopez majority earlier removed Mr. Lopez from the corporate, citing lack of trust and confidence over the P125-billion hydropower and gas deals, which they alleged were entered into without their knowledge.<\/p>\n<p class=\"p3\">Mr. Puno told shareholders that the hydropower deal received \u201cunanimous approval following several questions, clarifications, deliberations, and evaluation amongst the administrators.\u201d<\/p>\n<p class=\"p3\">Shares in First Gen fell 2.38% to P15.60 each on Thursday. \u2014 <b>Sheldeen Joy Talavera<\/b><\/p>\n<\/p><\/div>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Upper Wawa Dam in Rizal \u2014 PRIMEINFRA.COM LOPEZ-LED First Gen Corp. expects its investments in hydropower projects owned by Razon-led Prime Infrastructure Capital, Inc. to contribute P16 billion annually starting in 2031, potentially becoming the biggest earnings contributor across its portfolio. First Gen President and Chief Operating Officer Francis Giles B. Puno said the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":342306,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[21159,3954,44192,49243,10974,16914],"class_list":["post-342305","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","tag-annually","tag-gen","tag-hydropower","tag-p16b","tag-projects","tag-yield"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/342305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/comments?post=342305"}],"version-history":[{"count":2,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/342305\/revisions"}],"predecessor-version":[{"id":342308,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/342305\/revisions\/342308"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/media\/342306"}],"wp:attachment":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/media?parent=342305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/categories?post=342305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/tags?post=342305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}