{"id":345231,"date":"2026-06-03T21:39:36","date_gmt":"2026-06-03T16:09:36","guid":{"rendered":"https:\/\/ebiztoday.news\/?p=345231"},"modified":"2026-06-03T21:39:36","modified_gmt":"2026-06-03T16:09:36","slug":"edc-sets-p25-billion-plan-to-spice-up-negros-geothermal-field","status":"publish","type":"post","link":"https:\/\/ebiztoday.news\/index.php\/2026\/06\/03\/edc-sets-p25-billion-plan-to-spice-up-negros-geothermal-field\/","title":{"rendered":"EDC sets P25-billion plan to spice up Negros geothermal field"},"content":{"rendered":"<p><\/p>\n<div>\n<div class=\"td-post-featured-image\">\n<figure><figcaption class=\"wp-caption-text\">EDC\u2019s Palinpinon-1 geothermal power facility in Negros Island. \u2014 EDC<\/figcaption><\/figure>\n<\/div>\n<p class=\"p2\">ENERGY DEVELOPMENT Corp. (EDC) is planning to take a position about P25 billion to enhance steamfield performance and expand energy storage capability at its Southern Negros geothermal operations, in line with a filing with the Department of Environment and Natural Resources.<\/p>\n<p class=\"p3\">The corporate is looking for to amend its environmental compliance certificate (ECC) to permit expanded operations, additional drilling and infrastructure to support long-term steam production.<\/p>\n<p class=\"p3\">EDC said the initiative wouldn&#8217;t increase the sector\u2019s installed capability of 282.5 megawatts (MW), but would improve how steam resources are managed, enhance operational flexibility and ensure stable supply in the long run.<\/p>\n<p class=\"p3\"><span class=\"s2\">\u201cThe proposed modifications are intended to support sustained geothermal steam production, improve reservoir management, optimize operational efficiency, and strengthen energy reliability inside the Southern Negros Geothermal Project,\u201d the corporate said.<\/span><\/p>\n<p class=\"p3\">While the general project area has been reduced, operational space for facilities will expand from 151.5 hectares to 400 hectares to accommodate additional infrastructure.<\/p>\n<p class=\"p3\">The corporate plans to drill eight more wells, bringing the whole to 137, and construct two more well pads, increasing the whole to 41.<\/p>\n<p class=\"p3\"><span class=\"s2\">EDC also proposed expanding its battery energy storage system (BESS) capability from an initial 30 megawatt-hours, with plans to triple its scale to support grid stability and improve dispatch flexibility.<\/span><\/p>\n<p class=\"p3\"><span class=\"s3\">\u201cBecause the project will likely be utilizing naturally occurring steam from the earth, the electricity generated by the project is predicted to offset the facility generated by coal and oil-fired power plants within the country,\u201d EDC said. \u201cFurther, the project will help improve fuel security and stability.\u201d<\/span><\/p>\n<p class=\"p3\">The Southern Negros facility has exceeded its 25-year average geothermal field lifespan but continues to generate output, in line with the corporate.<\/p>\n<p class=\"p3\">EDC, the renewable energy arm of Lopez-led First Gen Corp., has an installed capability of 1,480.19 MW, accounting for about 20% of the country\u2019s renewable energy output.<\/p>\n<p class=\"p3\">The corporate has been developing geothermal assets since 1976 across Bicol, Leyte, Negros Island and Mindanao, making it one in all the country\u2019s biggest geothermal operators. <b>\u2014 Sheldeen Joy Talavera<\/b><\/p>\n<\/p><\/div>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>EDC\u2019s Palinpinon-1 geothermal power facility in Negros Island. \u2014 EDC ENERGY DEVELOPMENT Corp. (EDC) is planning to take a position about P25 billion to enhance steamfield performance and expand energy storage capability at its Southern Negros geothermal operations, in line with a filing with the Department of Environment and Natural Resources. The corporate is looking [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":345232,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[474,34899,2239,6743,19677,48286,1239,1358],"class_list":["post-345231","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","tag-boost","tag-edc","tag-field","tag-geothermal","tag-negros","tag-p25billion","tag-plan","tag-sets"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/345231","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/comments?post=345231"}],"version-history":[{"count":2,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/345231\/revisions"}],"predecessor-version":[{"id":345234,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/345231\/revisions\/345234"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/media\/345232"}],"wp:attachment":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/media?parent=345231"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/categories?post=345231"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/tags?post=345231"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}