{"id":362268,"date":"2026-07-07T06:59:20","date_gmt":"2026-07-07T01:29:20","guid":{"rendered":"https:\/\/ebiztoday.news\/?p=362268"},"modified":"2026-07-07T06:59:20","modified_gmt":"2026-07-07T01:29:20","slug":"first-gen-secures-nia-approval-for-120-mw-pumped-storage-project","status":"publish","type":"post","link":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/","title":{"rendered":"First Gen secures NIA approval for 120-MW pumped storage project"},"content":{"rendered":"<p><\/p>\n<div>\n<div class=\"td-post-featured-image\">\n<figure><figcaption class=\"wp-caption-text\">FIRSTGEN.COM.PH<\/figcaption><\/figure>\n<\/div>\n<p class=\"p2\">FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project.<\/p>\n<p class=\"p3\">In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA authorizing the corporate to develop, construct, operate, and maintain the pumped-storage hydropower facility.<\/p>\n<p class=\"p3\">The agreement, which is renewable for one more 25 years, also gives First Gen the clearance and endorsement to secure the remaining permits needed for the project.<\/p>\n<p class=\"p3\">The Aya Pumped Storage Project, which was previously estimated to cost about P6 billion, is targeted to start business operations by 2030.<\/p>\n<p class=\"p3\"><span class=\"s1\">The project will utilize the Aya and Masiway reservoirs to store and generate electricity by pumping water from a lower reservoir to an upper reservoir during times of low electricity demand and releasing it through turbines to generate power when demand rises.<\/span><\/p>\n<p class=\"p3\"><span class=\"s2\">First Gen said the project is predicted to maximise the utilization of its existing hydropower assets in the realm, namely the 132-MW Pantabangan-Masiway plant and the 165-MW Casecnan plant.<\/span><\/p>\n<p class=\"p3\">\u201cMore facilities with storage and highly flexible operating parameters are key to stabilize the electricity grid, when it comes to addressing load variation and shifting energy supply to support evening peak demand. Project Aya will provide more resources for NIA to effectively manage priceless water resources,\u201d First Gen Senior Vice-President Dennis Michael P. Gonzales said.<\/p>\n<p class=\"p3\">NIA Administrator Eddie G. Guillen said the project supports efforts to strengthen the country\u2019s energy security while maximizing the usage of water resources.<\/p>\n<p class=\"p3\"><span class=\"s2\">\u201cWe reaffirm our shared commitment to advancing sustainable development, strengthening energy security, and maximizing the advantages of our water resources for future generations through the event of the Aya Pumped-Storage Project,\u201d he said.<\/span><\/p>\n<p class=\"p3\">As of end-2025, First Gen had an installed renewable energy capability of 1,764.2 MW from its hydro, geothermal, solar, and wind facilities nationwide. \u2014 <b>Sheldeen Joy Talavera<\/b><\/p>\n<\/p><\/div>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>FIRSTGEN.COM.PH FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":362269,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[53602,3147,3954,2412,4995,30998,4047,3539],"class_list":["post-362268","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","tag-120mw","tag-approval","tag-gen","tag-nia","tag-project","tag-pumped","tag-secures","tag-storage"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"ebiztoday.news\"\/>\n\t<meta name=\"google-site-verification\" content=\"G1Pyp5JbhWr5PQ6IszY06NoXKQCjx1ChQj88DWWzPq8\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"eBizToday - Your Weekly Window to World\u2019s Pulse\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday\" \/>\n\t\t<meta property=\"og:description\" content=\"FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/ebiztoday.news\/wp-content\/uploads\/2025\/01\/Ebiztoday-final_10102024-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/ebiztoday.news\/wp-content\/uploads\/2025\/01\/Ebiztoday-final_10102024-1.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-07-07T01:29:20+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-07-07T01:29:20+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ebiztodaynews\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday\" \/>\n\t\t<meta name=\"twitter:description\" content=\"FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/ebiztoday.news\/wp-content\/uploads\/2025\/01\/Ebiztoday-final_10102024-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#blogposting\",\"name\":\"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday\",\"headline\":\"First Gen secures NIA approval for 120-MW pumped storage project\",\"author\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/author\\\/ebiztoday-news\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/#person\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/ebiztoday.news\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/First-Gen-secures-NIA-approval-for-120-MW-pumped-storage-project.jpg\",\"width\":750,\"height\":500},\"datePublished\":\"2026-07-07T06:59:20+05:30\",\"dateModified\":\"2026-07-07T06:59:20+05:30\",\"inLanguage\":\"en-GB\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#webpage\"},\"articleSection\":\"Business, 120MW, approval, Gen, Nia, Project, Pumped, secures, storage\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ebiztoday.news#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ebiztoday.news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/category\\\/business\\\/#listItem\",\"name\":\"Business\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/category\\\/business\\\/#listItem\",\"position\":2,\"name\":\"Business\",\"item\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/category\\\/business\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#listItem\",\"name\":\"First Gen secures NIA approval for 120-MW pumped storage project\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ebiztoday.news#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#listItem\",\"position\":3,\"name\":\"First Gen secures NIA approval for 120-MW pumped storage project\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/category\\\/business\\\/#listItem\",\"name\":\"Business\"}}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/#person\",\"name\":\"ebiztoday.news\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#personImage\",\"url\":\"https:\\\/\\\/ebiztoday.news\\\/wp-content\\\/litespeed\\\/avatar\\\/7d9139c27a95269cfdad19bcccfecd85.jpg?ver=1782904441\",\"width\":96,\"height\":96,\"caption\":\"ebiztoday.news\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/author\\\/ebiztoday-news\\\/#author\",\"url\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/author\\\/ebiztoday-news\\\/\",\"name\":\"ebiztoday.news\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#authorImage\",\"url\":\"https:\\\/\\\/ebiztoday.news\\\/wp-content\\\/litespeed\\\/avatar\\\/7d9139c27a95269cfdad19bcccfecd85.jpg?ver=1782904441\",\"width\":96,\"height\":96,\"caption\":\"ebiztoday.news\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#webpage\",\"url\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/\",\"name\":\"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday\",\"description\":\"FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/author\\\/ebiztoday-news\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/author\\\/ebiztoday-news\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/ebiztoday.news\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/First-Gen-secures-NIA-approval-for-120-MW-pumped-storage-project.jpg\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#mainImage\",\"width\":750,\"height\":500},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/index.php\\\/2026\\\/07\\\/07\\\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\\\/#mainImage\"},\"datePublished\":\"2026-07-07T06:59:20+05:30\",\"dateModified\":\"2026-07-07T06:59:20+05:30\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/#website\",\"url\":\"https:\\\/\\\/ebiztoday.news\\\/\",\"name\":\"ebiztoday.news\",\"description\":\"Your Weekly Window to World\\u2019s Pulse\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/ebiztoday.news\\\/#person\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday","description":"FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA","canonical_url":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"G1Pyp5JbhWr5PQ6IszY06NoXKQCjx1ChQj88DWWzPq8","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#blogposting","name":"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday","headline":"First Gen secures NIA approval for 120-MW pumped storage project","author":{"@id":"https:\/\/ebiztoday.news\/index.php\/author\/ebiztoday-news\/#author"},"publisher":{"@id":"https:\/\/ebiztoday.news\/#person"},"image":{"@type":"ImageObject","url":"https:\/\/ebiztoday.news\/wp-content\/uploads\/2026\/07\/First-Gen-secures-NIA-approval-for-120-MW-pumped-storage-project.jpg","width":750,"height":500},"datePublished":"2026-07-07T06:59:20+05:30","dateModified":"2026-07-07T06:59:20+05:30","inLanguage":"en-GB","mainEntityOfPage":{"@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#webpage"},"isPartOf":{"@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#webpage"},"articleSection":"Business, 120MW, approval, Gen, Nia, Project, Pumped, secures, storage"},{"@type":"BreadcrumbList","@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/ebiztoday.news#listItem","position":1,"name":"Home","item":"https:\/\/ebiztoday.news","nextItem":{"@type":"ListItem","@id":"https:\/\/ebiztoday.news\/index.php\/category\/business\/#listItem","name":"Business"}},{"@type":"ListItem","@id":"https:\/\/ebiztoday.news\/index.php\/category\/business\/#listItem","position":2,"name":"Business","item":"https:\/\/ebiztoday.news\/index.php\/category\/business\/","nextItem":{"@type":"ListItem","@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#listItem","name":"First Gen secures NIA approval for 120-MW pumped storage project"},"previousItem":{"@type":"ListItem","@id":"https:\/\/ebiztoday.news#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#listItem","position":3,"name":"First Gen secures NIA approval for 120-MW pumped storage project","previousItem":{"@type":"ListItem","@id":"https:\/\/ebiztoday.news\/index.php\/category\/business\/#listItem","name":"Business"}}]},{"@type":"Person","@id":"https:\/\/ebiztoday.news\/#person","name":"ebiztoday.news","image":{"@type":"ImageObject","@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#personImage","url":"https:\/\/ebiztoday.news\/wp-content\/litespeed\/avatar\/7d9139c27a95269cfdad19bcccfecd85.jpg?ver=1782904441","width":96,"height":96,"caption":"ebiztoday.news"}},{"@type":"Person","@id":"https:\/\/ebiztoday.news\/index.php\/author\/ebiztoday-news\/#author","url":"https:\/\/ebiztoday.news\/index.php\/author\/ebiztoday-news\/","name":"ebiztoday.news","image":{"@type":"ImageObject","@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#authorImage","url":"https:\/\/ebiztoday.news\/wp-content\/litespeed\/avatar\/7d9139c27a95269cfdad19bcccfecd85.jpg?ver=1782904441","width":96,"height":96,"caption":"ebiztoday.news"}},{"@type":"WebPage","@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#webpage","url":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/","name":"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday","description":"FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/ebiztoday.news\/#website"},"breadcrumb":{"@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#breadcrumblist"},"author":{"@id":"https:\/\/ebiztoday.news\/index.php\/author\/ebiztoday-news\/#author"},"creator":{"@id":"https:\/\/ebiztoday.news\/index.php\/author\/ebiztoday-news\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/ebiztoday.news\/wp-content\/uploads\/2026\/07\/First-Gen-secures-NIA-approval-for-120-MW-pumped-storage-project.jpg","@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#mainImage","width":750,"height":500},"primaryImageOfPage":{"@id":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/#mainImage"},"datePublished":"2026-07-07T06:59:20+05:30","dateModified":"2026-07-07T06:59:20+05:30"},{"@type":"WebSite","@id":"https:\/\/ebiztoday.news\/#website","url":"https:\/\/ebiztoday.news\/","name":"ebiztoday.news","description":"Your Weekly Window to World\u2019s Pulse","inLanguage":"en-GB","publisher":{"@id":"https:\/\/ebiztoday.news\/#person"}}]},"og:locale":"en_GB","og:site_name":"eBizToday - Your Weekly Window to World\u2019s Pulse","og:type":"article","og:title":"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday","og:description":"FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA","og:url":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/","og:image":"https:\/\/ebiztoday.news\/wp-content\/uploads\/2025\/01\/Ebiztoday-final_10102024-1.png","og:image:secure_url":"https:\/\/ebiztoday.news\/wp-content\/uploads\/2025\/01\/Ebiztoday-final_10102024-1.png","article:published_time":"2026-07-07T01:29:20+00:00","article:modified_time":"2026-07-07T01:29:20+00:00","article:publisher":"https:\/\/www.facebook.com\/ebiztodaynews","twitter:card":"summary_large_image","twitter:title":"First Gen secures NIA approval for 120-MW pumped storage project - eBizToday","twitter:description":"FIRST GEN CORP. has secured authorization from the National Irrigation Administration (NIA) to develop its planned 120-megawatt (MW) Aya Pumped Storage Project in Pantabangan, Nueva Ecija, clearing a key regulatory hurdle for the project. In an announcement on Monday, the Lopez-led power producer said it had signed a 25-year memorandum of agreement (MoA) with NIA","twitter:image":"https:\/\/ebiztoday.news\/wp-content\/uploads\/2025\/01\/Ebiztoday-final_10102024-1.png"},"aioseo_meta_data":{"post_id":"362268","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2026-07-07 02:06:03","updated":"2026-07-07 02:06:03","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/ebiztoday.news\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/ebiztoday.news\/index.php\/category\/business\/\" title=\"Business\">Business<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFirst Gen secures NIA approval for 120-MW pumped storage project\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/ebiztoday.news"},{"label":"Business","link":"https:\/\/ebiztoday.news\/index.php\/category\/business\/"},{"label":"First Gen secures NIA approval for 120-MW pumped storage project","link":"https:\/\/ebiztoday.news\/index.php\/2026\/07\/07\/first-gen-secures-nia-approval-for-120-mw-pumped-storage-project\/"}],"_links":{"self":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/362268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/comments?post=362268"}],"version-history":[{"count":2,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/362268\/revisions"}],"predecessor-version":[{"id":362271,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/posts\/362268\/revisions\/362271"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/media\/362269"}],"wp:attachment":[{"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/media?parent=362268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/categories?post=362268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ebiztoday.news\/index.php\/wp-json\/wp\/v2\/tags?post=362268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}